Koreanization in Detail Design

 
 

What we have been most concerned about over the past few months is ultimately the realization of the details. Even if we design innovative details, the ultimate obstacle is whether they can be verified. For this reason, a process of making details realistic is necessary so that even small local construction companies lacking construction capabilities can carry out construction. In a grandiose sense, it is a self-deprecating downgrade process called the Koreanization of details. This requires the architect's persistence to maintain the original plan amidst the accompanying design changes. The desire for new details, rather than a patchwork of details received from partners, is the source of architectural challenges. As an extension of that, detailed model work is essential. A physical model of at least 1/50 scale goes beyond simple mass study and becomes a guide to issues that may arise at construction sites. I am grateful to Associate Designer Woo-jong Cho for continuing his excellent studies for a long time despite his busy work.

지난 몇달간 가장 고민했던 부분은 결국 디테일의 현실화. 혁신적인 디테일을 설계해도 결국 걸림돌이 되는 것은 실증가능여부다. 때문에 시공능력이 부족한 영세한 지방 건설사들도 시공할 수 있도록 디테일을 현실화 시키는 과정이 필요하다. 거창하게는 디테일의 한국화라는 자조적인 다운그레이드 과정이다. 이를 통해 수반되는 설계변경 속에서 원안 유지를 위한 건축가의 고집이 필요하다. 협력사들에서 받은 디테일의 짜집기가 아닌 새로운 디테일에 대한 갈망은 건축적 도전의 양분이된다. 그 연장선상에서 디테일한 모형 작업은 필수다. 최소 1/50 스케일의 물리모형은 단순한 매스스터디를 넘어 현장에서 발생가능한 이슈들에 대한 가이드가 된다. 바쁜 업무속에서 긴시간 훌륭한 스터디를 지속해 준 조우종 차장에게 감사한다.

 
 
 

Foundation Work_ Wondang Gateball Stadium

 
 

Wondang Gateball Stadium is the result of applying many active architectural devices based on Adaptive Architecture. A variety of Sustainable Design methodologies were applied, including the Ventilation In-Let System to actively induce natural ventilation within the stadium, the Sloped Ceiling Curtain Wall to optimize the inflow of natural light, and the Extended Eaves to control the excessive inflow of direct sunlight. The purpose of all these active devices is ultimately to provide a healthy sports space for local seniors through the construction of a gateball stadium. The foundation framing work of the Wondang Gateball Stadium, for which a lot of time and effort was put into detailed design, has been completed.

원당 게이트볼 경기장은 Adaptive Architecture에 기반한 능동적 건축디바이스들이 다수 적용된 결과물이다. 경기장내 적극적인 자연환기 유도를 위한 Ventilation In-Let System, 자연광 유입을 최적화 시키는 Sloped Ceiling Curtain Wall, 직사광선의 과도한 유입을 조절하는 Extended Eaves 등 다양한 Sustainable Design 방법론들이 적용되었다. 이 모든 능동적 디바이스들의 목적은 결국 게이트볼 경기장 건립을 갈망해오신 지역 어르신들에게 건강한 체육공간을 제공하기 위함이다. 디테일 설계에 많은 시간과 노력을 쏟아부었던 원당 게이트볼 경기장의 기초부 골조 작업이 마무리됐다.